JB Removals SydneyJB RemovalsSydney · Since 2005

THE WORK BEHIND THE MOVE

JB Removals projects

Real loads. Challenging access. Carefully planned handling.

Explore completed residential and commercial jobs, from carved stonework and appliances to brewery vessels, machinery and specialist equipment. Each project shows how the item, property and destination shaped the moving method.

This library brings the examples together. Open a case study for the job-specific detail, or follow the relevant service link when you are ready to discuss your own move.

Explore the projects
JB crew using a gantry around supported stonework at stepped access
Equipment selected around the actual item and access route.

COMPLETED PROJECT EXPERIENCE

Browse the project library

Choose a theme to explore related examples. Stair-access projects may use stair climbers, gantries or another assessed method; the case study explains what was used.

11 projects

Large timber-clad 4 Pines brewing vessels inside the Mona Vale Barrel Room

COMMERCIAL PROJECT

Three brewing vessels

Three brewing vessels, each around one tonne, relocated from Mona Vale to Brookvale. JB prepared the access route, protected the venue and coordinated pallet handling with a HIAB-equipped truck.

Read the project method : Three brewing vessels
Protected 400kg gelato display fridge secured on the Hercules stair climber

COMMERCIAL PROJECT

400kg gelato display fridge

A 400 kg display fridge moved down three flights of stairs, then raised over a bench into a restricted commercial service area. Stair handling and final placement needed separate equipment stages.

Read the project method : 400kg gelato display fridge
A 250 kg commercial refrigerator fully wrapped and protected with a custom MDF shell on a JB Removals truck

COMMERCIAL PROJECT

250kg Commercial Fridge Move

When a 250 kg commercial refrigerator would not fit through the doorway, JB planned a window entry in Glebe with traffic control, custom MDF casing and protection around a marble counter.

Read the project method : 250kg Commercial Fridge Move
A 700kg marble sculpture mechanically tilted on a JB Removals stair climber inside a protected building corridor

SPECIALIST PROJECT

700kg Marble Sculpture Removal

A replacement lift was smaller than the building’s original lift. JB secured and mechanically tilted a 700 kg marble sculpture to negotiate the restricted opening, with lift technicians attending.

Read the project method : 700kg Marble Sculpture Removal

PLAN YOUR OWN MOVE

Choose a service for your next enquiry

A completed job is a useful reference, but its equipment or crew is not an automatic prescription for another item. Send photographs, dimensions, weight and the access at both properties so JB can assess your move.

Heavy items and lifting

Discuss substantial, fragile or awkward loads and the support, protection and lifting arrangements they may need.

Explore Heavy Moves →

Business relocations

Plan commercial loads, working-site access and delivery requirements with the people coordinating your business move.

Explore Commercial Moves →

Stair climbers and stair access

Compare the available service paths and request an assessment of the load, staircase, landings and final placement.

Explore Stair Climber services →

Tell JB about your item and access

Start with the item photographs and the complete pickup and delivery route. The team can then recommend the appropriate service.

Request an assessment →
Free moving enquiry Start in under 10 seconds

FAST, FREE MOVING ENQUIRY

Start your move in under 10 seconds.

Enter the route and date. JB will confirm the rest with you.
  • ✓ Two quick steps
  • ✓ No obligation
  • ✓ Direct to JB Sales
Step 1 of 2
  1. 1 Move details
  2. 2 Contact details
About 10 seconds
Where are you moving?

Start with the route and date. JB will confirm everything else with you.

SEARCH OR TALK TO JB

What do you need help moving?

Search a service, tool, guide or Sydney suburb.

Type a question or tap Talk to JB.

Back to top