Three brewing vessels — 1 tonne each
1 tonne each · Mona Vale to Brookvale
Five hours of planning supported a six-hour relocation using route preparation, floor protection, pallet handling and a HIAB-equipped truck.

- ITEMS
- Three vessels
- WEIGHT
- 1 tonne each
- ROUTE
- Mona Vale to Brookvale
- MOVE
- 6 hours
The complete handling method
Brewing vessel access constraints
The vessels occupied a working hospitality venue. The route included a raised internal edge, a doorway that needed removal, an uneven external footpath, traffic considerations and nighttime work.
Planning the vessel relocation
The complete route was assessed before execution. A safety plan and Safe Work Method Statement documented the movement sequence, access preparation, floor protection, loading position and road-transport requirements.
Vessel lifting and transport equipment
A HIAB-equipped truck, electric pallet jack, specialist pallet jacks, rated slings and suitable lifting equipment were selected for distinct stages of the relocation.
Brewing vessel relocation outcome
All three vessels were relocated using one coordinated methodology covering the internal room, doorway, footpath, loading position and destination.
Project photographs
Photographs from this JB project. Select an image to view its full frame.
Plan your specialist move
Heavy lifting and specialist handling
Send the item dimensions, confirmed weight and photographs of the full access route so JB can assess the equipment and handling required.
Explore the service →Commercial relocation planning
Discuss working-site access, delivery constraints and the arrangements needed around your business move.
Explore the service →