JB Removals SydneyJB RemovalsSydney · Since 2005

REAL JB PROJECT · SPECIALIST HANDLING

500kg Commercial Machine Stair Descent

Marrickville · approx. 30-metre route · 10-hour operation

Restricted head clearance required the 500kg machine to travel down a long stepped route. JB built a custom ramp and combined specialised rollers, a haul-back restraint system, rear counterbalancing lifts and Hercules support to control the descent.

A 500kg commercial machine descending a custom-built stair ramp under controlled restraint in Marrickville
A 500kg commercial machine descending a custom-built stair ramp under controlled restraint in Marrickville
ITEM
Commercial machine
WEIGHT
Approx. 500 kg
ROUTE
Approx. 30 metres
OPERATION
Approx. ten hours

The complete handling method

01

A route dictated by height clearance

The commercial machine weighed approximately 500 kg. Limited overhead clearance ruled out a conventional upright move. The workable route took the load down approximately 30 metres of stepped access.

02

A full day built around preparation

The project occupied approximately 10 hours on site, with the day devoted to route preparation, ramp construction and the controlled move. JB assessed the machine’s dimensions and balance, the stair gradient, overhead clearance, transitions and the working positions needed to support and restrain the load.

03

Building a continuous ramp

The individual steps could not provide a suitable rolling surface for a machine of this weight. JB custom-built a continuous ramp over the staircase and aligned each section along the route. This gave the specialised rollers a controlled surface and protected the tiles beneath.

04

Holding back and counterbalancing 500 kg

A dedicated restraint system held the load back from above so gravity could not accelerate the machine down the incline. Specialised lifting equipment at the rear counterbalanced the weight, while Hercules supported the machine as the crew advanced it progressively along the ramp.

05

The controlled Marrickville descent

The team coordinated the restraint, rear lift, rollers and Hercules support through each section of the route, pausing to check alignment and clearance before continuing. After approximately 10 hours of preparation and controlled handling, the 500 kg machine reached the lower work area safely.

Project photographs

Photographs from this JB project. Select an image to view its full frame.

Plan your specialist move

Heavy lifting and specialist handling

Send the item dimensions, confirmed weight and photographs of the full access route so JB can assess the equipment and handling required.

Explore the service →

Commercial relocation planning

Discuss working-site access, delivery constraints and the arrangements needed around your business move.

Explore the service →

← Browse more JB projects

Planning a similar move?

Share your items, photographs and access details so JB can assess the move.

Have the details ready? Build your moving plan →
Free moving enquiry Start in under 10 seconds

FAST, FREE MOVING ENQUIRY

Start your move in under 10 seconds.

Enter the route and date. JB will confirm the rest with you.
  • ✓ Two quick steps
  • ✓ No obligation
  • ✓ Direct to JB Sales
Step 1 of 2
  1. 1 Move details
  2. 2 Contact details
About 10 seconds
Where are you moving?

Start with the route and date. JB will confirm everything else with you.

SEARCH OR TALK TO JB

What do you need help moving?

Search a service, tool, guide or Sydney suburb.

Type a question or tap Talk to JB.

Back to top