600 kg German dental machine: delivery and assembly

600 kg total · 200 kg base + 400 kg top · crane-assisted assembly · approx. 6 hours

The dental machine had an estimated six-month production lead time. JB planned its transport and assembly to limit vibration, using a large-tail-lift truck, a one-tonne furniture trolley and a counterweighted crane.

JB Removals crew using a counterweighted crane to position a German dental machine on its protected base
JB Removals crew using a counterweighted crane to position a German dental machine on its protected base
TOTAL WEIGHT
600 kg
BASE
200 kg
UPPER SECTION
400 kg
TIME
Approx. six hours

The complete handling method

01

High-consequence specialist equipment

The machine was manufactured in Germany for a specialist dental client. A replacement could take around six months to produce, so any serious damage could create a lengthy operational delay and potentially a six-figure financial consequence.

02

Site inspection and lift planning

JB inspected the site before moving day. Before the equipment arrived, the team checked the unloading position, route, component weights and protection needs. They also planned the trolley and crane positions, rigging points and final assembly sequence.

03

Low-vibration transport and handling

A specialist truck with a large tail lift supported controlled unloading. The machine sections were wrapped, cushioned and restrained, then moved slowly on a purpose-built furniture trolley rated to carry up to one tonne. Every transition was managed to limit vibration, sudden movement and impact.

04

Mechanical assembly instead of manual lifting

The machine arrived in two primary sections: a 400 kg upper section and a 200 kg base, weighing 600 kg in total. Rated slings and a counterweighted crane supported the upper section. The crew guided it into alignment and lowered it gently onto the base, avoiding uncontrolled manual lifting.

05

Dental machine installation outcome

From unloading and protective preparation through to positioning, crane-assisted assembly and final placement, the complete operation took approximately six hours. The machine was installed successfully under one planned and controlled methodology.

Project photographs

Photographs from this JB project. Select an image to view its full frame.

Plan your specialist move

Heavy lifting and specialist handling

Send the item dimensions, confirmed weight and photographs of the full access route so JB can assess the equipment and handling required.

Explore the service →

Commercial relocation planning

Discuss working-site access, delivery constraints and the arrangements needed around your business move.

Explore the service →

← Browse more JB projects

Free moving enquiry Start in under 10 seconds

FAST, FREE MOVING ENQUIRY

Start your move in under 10 seconds.

Enter the route and date. JB will confirm the rest with you.
  • ✓ Two quick steps
  • ✓ No obligation
  • ✓ Direct to JB Sales
Step 1 of 2
  1. 1 Move details
  2. 2 Contact details
About 10 seconds
Where are you moving?

Start with the route and date. JB will confirm everything else with you.

SEARCH OR TALK TO JB

What do you need help moving?

Search a service, tool, guide or Sydney suburb.

Type a question or tap Talk to JB.

Back to top